Administration Building No.01 consists of 5 floor our scope of work was HVAC system and Fire Fighting System, HVAC System we use VRF
System with total capacity 800 Ref. Ton and for Ventilation system using centrifugal, fan sections fans and smoke fans, Fire Fighting System using Water System (Sprinkler and standpipe system), Gas System (NOVEC System ,CO2 and Fire Trace).
Project Information
Project Highlight
OWNER:
NATIONAL TRAINING ACADEMY
Location:
Sheik Zayed – 6 October
Duration:
9 Months
Size:
12,000 M²
Services:
MEP